Volume pricing available · Sourcing records available on request
Responds within 24 hours
PARAMETER
VALUE
Mfr
Winbond Electronics
Package
Tray
DigiKey Programmable
Not Verified
Memory Type
Volatile
Memory Format
DRAM
Technology
SDRAM - DDR3L
Memory Size
2Gbit
Memory Organization
128M x 16
Memory Interface
Parallel
Clock Frequency
667 MHz
Write Cycle Time - Word, Page
15ns
Access Time
20 ns
Voltage - Supply
1.283V ~ 1.45V
Operating Temperature
-40°C ~ 105°C (TC)
Mounting Type
Surface Mount
Package / Case
96-VFBGA
Supplier Device Package
96-VFBGA (7.5x13)
Product Description
IC SDRAM DDR3L 2G 96WBGA
FAQs
Can you guarantee authenticity for obsolete parts?
In the obsolete market, absolute guarantees are not realistic due to fragmented supply chains. Instead, we control risk through supplier selection, inspection, and risk-based testing aligned with industry standards.
What if parts fail after delivery?
All parts are covered by a 45-day functional warranty from the date of receipt. Claims must be supported by an accredited third-party test report.
Can I request specific tests before shipment?
Yes. You can request tests such as X-ray, decapsulation, electrical testing, or others based on your requirements. These are arranged through certified labs at additional cost.
Do you provide inspection or test reports?
Yes. Inspection images and test reports (if testing is conducted) can be shared prior to shipment upon request.
What happens if I reject it after inspection?
If rejection is based on valid findings from an agreed inspection or test, we will review and support resolution. Orders are otherwise non-cancellable once procurement is completed.
Do you require advance payment?
Yes. Orders are processed on advance payment due to the nature of sourcing obsolete components.
Who handles shipping and logistics?
Shipping is typically done on the customer’s DHL, FedEx, or UPS account. If needed, we can arrange shipment on your behalf.
Is escrow or milestone-based payment available?
Yes. Orders are executed through an escrow-based structure. Funds are released to the supplier only after delivery and buyer approval, ensuring control over both quality and transaction risk.