sales@make-tronics.com|ISO 9001:2015 Certified
Line CardProduct Catalog
Make-Tronics
REQUEST QUOTERFQ
ProductsQualityBuyer ProtectionAbout UsContact UsCase Studies
Make-Tronics

Your trusted partner for obsolete and hard-to-find electronic components. Keeping the world's technology running.

Our Locations

  • United Arab Emirates
    Maketronics Communications L.L.C-FZ
    Meydan Grandstand, 6th floor, Meydan road,
    Nad Al Sheba, Dubai, U.A.E

Our Locations

  • India
    Maketronics Communications LLP
    106, Jaypee Klassic Wishtown, Sector 134
    Noida, Uttar Pradesh 201304

products

  • Line Card
  • Product Catalog
  • Manufacturers
  • Categories

Legal

  • Shipping Policy
  • Terms & Conditions
  • Privacy Policy
  • Refund Policy
© 2026 Make-Tronics. All rights reserved.
  1. Home
  2. Market Insights
  3. Case Studies
  4. Avoiding Downtime: How Maketronics Sourced Critical DC-DC Converters Amid Long Lead Times for a US Industrial Automation Firm
Avoiding Downtime: How Maketronics Sourced Critical DC-DC Converters Amid Long Lead Times for a US Industrial Automation Firm
CASE STUDY
Jun 4, 2025 3 min read

Avoiding Downtime: How Maketronics Sourced Critical DC-DC Converters Amid Long Lead Times for a US Industrial Automation Firm

The Challenge: Long Lead Times for a Crucial Power Module

A US-based industrial automation company was on a tight production schedule when they hit a critical roadblock — the UEI30-120-Q12P-C DC-DC converter module they relied on was out of stock across all authorized channels. Although the part was still active, lead times had stretched to over 20 weeks, threatening production timelines and delivery commitments.

In high-stakes manufacturing, a delay of even a few weeks can result in missed service-level agreements (SLAs), idle factory floors, and downstream revenue loss.


Why the UEI30-120-Q12P-C Was Critical

The UEI30-120-Q12P-C, made by Murata Power Solutions, is a high-efficiency isolated DC-DC converter designed for rugged and space-constrained applications. For this automation firm, it was embedded in a control module powering smart industrial equipment.

Its features included:

  • Wide 18–75VDC input range

  • Compact through-hole design

  • Reliable 12V regulated output

  • Designed for harsh industrial environments

Substituting the part would’ve triggered a costly requalification process and delayed the customer’s product rollout.


Maketronics’ Solution: Lead Time Eliminated Without Compromise

Our team at Maketronics leveraged its global network of vetted, quality-assured suppliers to locate authentic stock of the UEI30-120-Q12P-C. Within days, we were able to:

✅ Confirm availability from a trusted supplier

✅ Verify quality and traceability of the components

✅ Ship the parts to the US within 7 business days

✅ Eliminate the production haults or delays


Results Delivered

  • Zero production delays

  • Saved 20+ weeks of lead time

  • No requalification or redesign required

  • Customer retained delivery commitments to their end-clients


Turning Supply Chain Gaps into Opportunity

At Maketronics, we specialize in solving time-sensitive sourcing challenges. Whether you're dealing with long lead times, allocation shortages, or hard-to-find components, we deliver solutions that keep production lines moving and customers satisfied.

Need help bridging sourcing gaps? Let’s talk.

#Maketronics #ComponentSourcing #IndustrialAutomation #Murata #DCtoDCConverter #SupplyChainResilience #ElectronicsManufacturing #LeadTimeSolutions #Procurement

Ready to secure your supply chain?

Don't let obsolescence stop your production. Our experts are ready to find the hard-to-find.

Contact SalesView Line Card

Related Insights

Loading related case studies...

Need obsolete parts?

Get a quote in 24 hours.

Get Help Sourcing